A Build-Your-Own Cake Bar Is Coming to Westfield Mt Gravatt on 28 March

A first-of-its-kind dessert concept called The Cake Bar opens at Westfield Mt Gravatt on Saturday 28 March, giving shoppers at the Upper Mt Gravatt centre the ability to build a fully personalised, freshly assembled cake on the spot rather than ordering one day in advance.



The concept fills a gap that sits between the impulse dessert market — think Yo-Chi, which already operates at Garden City — and the traditional custom cake bakery, where lead times and minimum orders put the experience out of reach for a spontaneous weeknight craving or a last-minute birthday. The Cake Bar plants itself squarely in between: a fresh cake, assembled to order, available in the time it takes to walk from the carpark to the food court.

A Custom Dessert Experience

Customers kick things off by picking a cake base from a solid lineup of flavours. From there, the build branches out across premium fillings, frostings, and toppings, with a menu ranging from decadent chocolate to childhood throwbacks like raspberry jellies, sherbet, and sour straps. Crucially, the range is built for everyone, offering gluten-free and vegan options to ensure those with dietary requirements don’t miss out on the sugar hit. The model is deliberately open-ended—the same counter can whip up a clean, frosted red velvet for the traditionalists or a stacked, sprinkle-covered creation for the kids.

The kitchen assembles the order fresh, on the spot, from premium ingredients. Nothing sits pre-made in a display fridge. That distinction matters operationally: it means the quality of a custom-ordered cake without the custom-order wait.

A Sweet Addition to the Food Scene

Westfield Mt Gravatt is one of Brisbane’s largest shopping centres, located approximately 12 kilometres south of the CBD, with more than 400 retailers, three supermarkets, Event Cinemas, and a food and dining offer that spans two indoor food courts, an outdoor dining precinct and an Asian street food strip called 8 Street. The centre draws shoppers from Mt Gravatt, Macgregor, Wishart, Mansfield, Rochedale South and across Brisbane’s southside.

The dessert category at the centre already includes Yo-Chi, alongside a broader entertainment and dining precinct that includes Timezone, Holey Moley, Cloud 8 Karaoke and Hijinx Hotel. The Cake Bar adds a format that none of the existing operators cover: a made-to-order, whole-cake dessert experience priced and positioned for everyday shoppers rather than special-occasion pre-orders.

For families doing the weekly shop, the model is simple enough to be a spontaneous stop rather than a planned event. For parents with kids in tow — and Garden City’s family-heavy southside catchment means there are plenty of them on any given Saturday — the interactive build-your-own format offers more engagement than a standard dessert counter.

Good News for Sweet Tooths

Brisbane’s dessert and specialty food market has expanded significantly over the past five years, with concepts built around the build-your-own model proving durable in both food courts and high-street locations. The Cake Bar represents the format applied to one of the few categories — fresh cake — that had not yet made the transition from pre-order to impulse. This adds a locally accessible version of an experience that previously required either a custom order from a bakery or a trip into the CBD.

The Cake Bar is at Westfield Mt Gravatt, Logan Road, Upper Mt Gravatt. More information is available here ahead of the 28 March opening.



Published 12-March-2026.

Daly’s Native Plants in Mansfield Flourishes with New Low-Cost Water Initiative

Daly’s Native Plants in Mansfield is among the recipients who received a collective total of 100 megalitres of low-cost water, as part of a statewide initiative to support small businesses and community groups.



The recent release of low-cost water has been tremendously helpful to the nursery in sustaining its operations amidst the challenges of drought and the economic downturn caused by the pandemic.

This initiative is part of a broader strategy to support local businesses by providing affordable resources for their survival and growth.

 “The allocation of low-cost water was an emotional moment for us. It’s not just about business survival; it’s about keeping our community green and supporting the local ecosystem with our native plants,” Owner Robin Daly shared. “This support helps us continue our mission of environmental stewardship and community service.”

Support and Benefits

“Supporting Daly’s Native Plants is a key example of our commitment to easing cost pressures on Queensland’s small businesses,” Water Minister Glenn Butcher expressed enthusiasm about the support extended to Daly’s Native Plants. “This initiative is about more than just financial relief; it’s about fostering a sustainable local economy and promoting environmental well-being.”

Corrine McMillan, Member for Mansfield, emphasised the initiative’s importance for local businesses, noting that access to low-cost water is alleviating the substantial financial and operational challenges faced by small enterprises like Daly’s Native Nursery. This assistance is crucial for the survival of such businesses and benefits the broader community by enhancing environmental health.

Photo Credit: Supplied

Encouraging Future Participation

With 67 megalitres of water still available for allocation, the government is encouraging other local businesses and community groups to apply. This ongoing initiative supports eligible entities until May 2025, aiming to distribute the remaining water to aid local development and sustainability further.



Daly’s Native Plants promotes sustainable practices by cultivating native plants, contributing to local greenery, biodiversity, and fighting climate change.

Published 22-April-2024

Mansfield Intersection Upgrade Now Underway

Upgrade works on the Newnham and Wecker Rd intersection in Mansfield are already underway, with expected completion by mid-2022. 

Construction on the $13.3-million upgrade project commenced in late November 2021, with the establishment of the site compound in Graham Lord Park and relocation of public utilities. 



Part of the initial construction works will also involve the removal of some trees along Newnham Road. Upon completion of the upgrade project, however, some 300 trees, plants, and ground cover vegetation will be planted within the area to replace those that have been removed. 

Photo credit:  Brisbane City Council / brisbane.qld.gov.au

To be constructed is a new northbound right turn lane on Newnham Road (northbound) complete with a right turn arrow for a full traffic flow control. Also, an additional lane will be installed for vehicles coming from Wecker Road and making a right turn into Newnham Road (northbound). 

There will also be a signalised pedestrian crossing on a left turn slip lane situated on Newnham Road (southbound). Lastly, the two bus stops at Newnham Road will undergo an upgrade as well.

Congestion and Safety Issues

On a daily basis, the Newnham Road and Wecker Road intersection accommodate around 35,000 vehicles, 474 buses, 55 cyclists, and 186 pedestrians, making it one of the busiest in southern Brisbane. 

Apart from congestion, safety is another concern in this intersection where a total of 18 crashes were reported between 2014 and 2019. Of these total reported crashes, 13 occurred due to motorists coming from Newnham Road, where there’s a high volume of traffic, were not able to make a right turn into Wecker Road safely.

Once completed, the upgrade project will allow the intersection to accommodate future traffic demands with improved safety and reduced traffic congestion. Meanwhile, footpaths, shared paths, and pedestrian crossing facilities located at traffic lights will improve the intersection’s connectivity. 



The project is jointly funded by the Australian Government through its Urban Congestion Fund and the Brisbane City Council through its Better Roads for Brisbane program with each contributing $12 million and $1.3 million, respectively.

Construction hours are between Monday and Saturday beginning 7am until 5 pm. However, some work will occur at night, Sunday to Thursday from 7 pm to 5 am, to reduce the impact on traffic and ensure the safety of both motorists and workers at the construction site. 

Moreover, around 12 on-street parking spaces at the intersection will be removed and a full-time “No parking” policy will take effect to replace the peak period clearway.