A Six-Storey Apartment Block and Ten Townhouses Are Taking Shape on Cremin Street

An amended development application has been lodged for the second stage of a residential project at 10–12 Cremin Street and 1–5 Player Street in Upper Mount Gravatt, proposing a six-storey apartment building alongside an approved three-storey townhouse component to create a combined community of 50 dwellings on a 2,762-square-metre site.



The application, an “Other Change” to the existing approved development, has been designed by Nettleton Tribe and planned by Mewing Planning Consultants. It modifies the approved built form for the apartment building component while retaining the broader structure of a combined apartment and townhouse development that fronts Cremin Street, Pickworth Street and Player Street.

The Cremin Street site sits within the Upper Mount Gravatt Medium Density Sub-Precinct of the Mt Gravatt Corridor Neighbourhood Plan, an area zoned to accommodate exactly this kind of mid-rise infill development in a location with strong access to public transport, retail and employment along the Mount Gravatt corridor.

Fifty dwellings across two distinct building types

The combined development delivers 50 residential dwellings through two building forms that serve different household types. The six-storey apartment building contains 40 apartments, split between 10 one-bedroom and 30 two-bedroom configurations, with private balconies ranging from 12.6 to 35 square metres.

Photo Credit: DA A007015770

The three-storey townhouse component provides 10 four-bedroom townhouses, adding a family-scale housing type to a development that otherwise skews toward smaller household sizes.

One of the more distinctive elements of the project is its use of modular construction methodology, an approach that carries structural and delivery advantages, particularly for a site of this complexity where two different building types must be integrated coherently across a relatively compact 2,762-square-metre footprint.

Photo Credit: DA A007015770

Shared facilities include a resident common room and administration area, secure bicycle storage for 40 resident and 14 visitor spaces, and 77 vehicle parking spaces across basement and ground-level areas, comprising 71 resident spaces and six visitor spaces. Lift access runs throughout the apartment building.

A streetscape designed to hold its ground

The Cremin Street frontage has been a focus of the design work from Nettleton Tribe. The built form uses vertical and horizontal structural rhythms expressed through setbacks, balconies, facade treatments and vertical breaks to create visual interest and variation along the street edge.

Ground-level landscaping along Cremin Street and the northern boundary adds a subtropical planting layer that softens the transition between the building and the public realm.

Photo Credit: DA A007015770

Mewing Planning Consultants describe the proposed changes as maintaining a high-quality architectural outcome that remains coherent with the previously approved tower form while improving the streetscape presentation. The ground-floor interface with Cremin Street is heavily landscaped, and the primary pedestrian entrance opens directly onto Cremin Street, keeping foot traffic oriented toward the main frontage.

Vehicle access runs via Pickworth Street rather than Cremin Street, separating pedestrian and vehicle movement at the street level.

Photo Credit: DA A007015770

Deep planting covers 389 square metres, representing 14.1 per cent of the site. Communal open space of 138.17 square metres provides residents with a shared outdoor area, supplemented by private balconies on each apartment.

Upper Mount Gravatt’s growing residential density

Upper Mount Gravatt has been absorbing increased residential density for several years, driven by its strong position along the Mount Gravatt corridor and its access to Garden City shopping centre, Logan Road retail, South East Busway services and Griffith University’s Nathan campus.

The Mt Gravatt Corridor Neighbourhood Plan has channelled that growth toward medium and higher density residential forms in precincts like the one surrounding Cremin Street, where the mix of lot sizes and street connectivity makes consolidation and infill development workable.

The Cremin Street project, with its combination of apartments and four-bedroom townhouses, reflects the kind of housing diversity the corridor plan envisages — different dwelling types for different household sizes in a location that does not require a car for most daily needs.

The application can be viewed through Brisbane’s planning portal.



Published 29-June-2026

A Mount Gravatt East Woman Was Among 16 People Allegedly Charged in a Major Brisbane Drug Trafficking Investigation

A 38-year-old woman was arrested at a Hathaway Street address in Mount Gravatt East during a search warrant on 3 May, as part of a months-long investigation into alleged methamphetamine trafficking that has resulted in 16 people being charged across Brisbane.



The investigation, known as Operation Yankee Rend, was conducted by Brisbane City Criminal Investigation Branch and wrapped up in May after commencing in January. The investigation’s closure resulted in 16 people being charged with more than 90 offences, including trafficking in dangerous drugs, supplying dangerous drugs, possessing proceeds from trafficking and supply, possessing dangerous drugs, and possession of weapons.

The Mount Gravatt East arrest was one of a series of search warrants and interceptions carried out across Brisbane and surrounding areas throughout the operation.

What police allegedly seized

Throughout the investigation, police seized 1.6kg of methamphetamine, 111g of cocaine, a revolver handgun and more than $16,000 of alleged drug cash, in addition to other drugs and drug-related items.

Photo Credit: QPS

The seizures took place across multiple locations and dates during the five-month investigation. On 7 March, police located a 36-year-old Redbank Plains man on Cedar Road in Redbank Plains.

Photo Credit: QPS

It will be alleged the man attempted to run from investigators and hide a bag of methamphetamine before he was intercepted and arrested. Investigators further allege a search warrant at a Wivenhoe-Somerset Road address in Somerset on 8 March resulted in the location of a revolver handgun.

The investigation that drove it

Operation Yankee Rend commenced in January following intelligence of methamphetamine being trafficked in Brisbane’s inner north. Brisbane City Criminal Investigation Branch ran the operation, with the City Valley Crime Group coordinating the arrest phase.

North Brisbane District City Valley Crime Group Acting Detective Inspector Sean Webster said the operation had a meaningful impact on local drug supply. “The investigations resulted in the disruption of significant local trafficking and supply of methamphetamine,” he said.

What happens next

The 16 people charged are expected to appear before Brisbane Magistrates Court at various future dates. All charges are alleged and none of the accused have been convicted. Investigations are continuing.

Anyone with information about drug activity in the area can contact Policelink via the online form or by calling 131 444. Anonymous reports can be made through Crime Stoppers on 1800 333 000 or at crimestoppersqld.com.au.



Published 9-June-2026

Big Changes Proposed for Abbeville Street Park as Community Feedback Opens

A draft concept plan for the upgrade of Abbeville Street Park in Upper Mt Gravatt is now open for community feedback, with proposals including a new amenities block, fitness station, multi-use sports court and improved access throughout the park’s popular dog off-leash area.



The plan has been developed following community input gathered in November 2025, when residents were asked to share their thoughts on what the park needed most. The feedback was clear: this is a park people use daily, and they want it to stay leafy and relaxed while becoming more comfortable and functional.

Feedback on the draft plan closes at 11.59pm on Sunday 14 June 2026.

A closer look at the proposed upgrades

The draft concept proposes a range of upgrades across the park’s 41 Abbeville Street site. A new amenities block would address the park’s most consistent gap, as the absence of public toilets has been a longstanding frustration for families and dog owners who spend extended time here.

Photo Credit: BCC

A multi-use sports court and rebound wall would complement the existing basketball half-court. A new fitness station would join the outdoor exercise equipment already on site, and accessible circuit and connecting pathways would improve movement throughout the park, including better links to and within the dog off-leash area.

Viewing areas, seating nodes and a picnic shelter round out the social spaces, while parallel parking along Abbeville Street would ease the pressure on street parking that builds during busy weekend mornings.

The upgrade will revitalise the existing playground, blending new equipment and nature play elements into the space families already love. 

Photo Credit: Google Maps

The plan also makes clear what will stay. The community garden, a well-used feature of the park, will not be affected by the upgrades. The plan leaves the vacant scout hall untouched, keeping it completely separate from the new recreational layout. 

A park that already punches above its weight

Abbeville Street Park is one of Upper Mt Gravatt’s most genuinely multi-use green spaces. Its fenced dog off-leash area, with a separate enclosure for smaller dogs, draws regulars from across the southern suburbs and has a reputation as one of the better dog parks in Brisbane’s south.

On any weekend morning the park fills with families at the playground, dog owners at the fence line and walkers doing laps of the bike and walking paths.

The community garden adds another layer of regular activity, and the basketball half-court sees use from older kids and teenagers who have few other spaces nearby. What the park has always lacked is a toilet block, which limits how long families can comfortably stay and makes the space less accessible for older residents and parents with young children.

Two chances to see the plan in person

Two information kiosks are running at the park itself for residents who want to see the concept plan in person and ask questions. The first runs tomorrow, Saturday 30 May, from 9am to 11am. The second session runs on Wednesday 3 June from 2.30pm to 4.30pm.

The draft concept plan is available to download and the online feedback survey can be completed here. For phone enquiries, the project team is available on 07 3178 5413 from 8.30am to 4.30pm, Monday to Friday.



Published 1-June-2026

Upper Mt Gravatt Centre Precinct Plan Opens for Community Consultation

Residents across Upper Mt Gravatt now have a direct say in what their suburb’s commercial heart looks like in the decades ahead, with community consultation open on a plan that will shape development along the Dawson Road corridor through to Newnham Road.



The Suburban Renewal Precinct Plan for Upper Mt Gravatt covers the stretch of the suburb anchored by Westfield Mt Gravatt and extending through Mt Gravatt-Capalaba Road to Newnham Road, taking in the mix of retail, commercial and residential land that makes up one of southern Brisbane’s busiest suburban centres. What gets built there, how tall, and what kind of neighbourhood it becomes are exactly the questions the plan is designed to settle, and right now, before any draft is written, is the moment when community input carries the most weight.

Feedback gathered during this initial phase goes directly to planners as they prepare the draft plan, which will come back to the community for a second round of input before anything is finalised. Planners expect to put the draft plan back to the community for review in late 2026 or early 2027, with the final version likely to be etched into the city plan by mid-2027.

A Centre Under Growing Pressure

Upper Mt Gravatt already carries a lot of weight for southern Brisbane. It draws shoppers, workers and service-seekers from well beyond its own suburb boundaries, and the infrastructure surrounding the centre, including the Upper Mt Gravatt library, nearby sporting fields, Mt Gravatt Outlook Reserve and Brisbane Metro turn-up-and-go services along the corridor, gives it a foundation that many suburban centres elsewhere in the city simply do not have.

Under current planning settings, landmark sites within the precinct can already reach up to 15 storeys. The precinct plan will work through whether zoning across a wider range of sites should be updated to allow more housing and mixed-use development in the locations best placed to handle it, while protecting the residential streets that surround the commercial core from inappropriate intensification.

Upper Mt Gravatt sits within a broader programme of suburban renewal plans across Brisbane that has already delivered adopted plans at Stones Corner, with work underway at Wynnum, Alderley, Mt Gravatt and Chermside. The approach across all of them centres on finding the best use of underutilised land within established, well-connected centres rather than pushing growth outward into areas that lack the same infrastructure base.

What Residents Are Being Asked

The ideas phase is deliberately open. Residents, business owners and anyone who uses the Upper Mt Gravatt centre can share what matters to them about the area as it stands, what they feel is missing, and what they want the precinct to look and feel like in the future. There are no set options to choose from at this stage. The aim is to hear from the people who actually live and work in and around the centre before planners sit down to draft anything formal.

That covers everything from the types of housing and services the community wants to see near the centre, to the quality of streets and public spaces, to how the plan can protect the character of the established neighbourhoods that border the precinct.

Why This Matters to the Community

Brisbane is growing fast, with around 600 people arriving in the city each week and a projected need for more than 210,000 new homes by 2046. Well-serviced centres like Upper Mt Gravatt, with their transport connections, community facilities and existing employment base, are exactly where that growth is likely to be directed. The precinct plan is not about whether change happens. It is about whether the community shapes it or watches it happen around them.

For residents of Upper Mt Gravatt, Mt Gravatt, Mansfield, Rochedale South and Eight Mile Plains, getting involved now, at the ideas stage rather than the objection stage, gives the best chance of seeing local priorities reflected in whatever is ultimately adopted. Once a precinct plan becomes part of the city plan, it sets the rules for development for years to come.

Residents can share their ideas by clicking this link or by writing to Neighbourhood Planning, Upper Mt Gravatt Centre Suburban Renewal Precinct, Brisbane City Council, GPO Box 1434, Brisbane QLD 4001.



Published 17-March-2026.